MAX Photos 2008
--
::
--
Bagged Moly Concentrates
--
::
--
MAX Ball Mills in action
--
::
--
MAX Flotation cells
--
::
--
MAX Crusher Building Siding Installation
--
::
--
MAX Fine Ore Bin Siding from Coarse Ore Bin
--
::
--
MAX Forklift Loading Concentrate Bags
--
::
--
MAX MX07-03 Drill Core Showing Mineralized Fragment
--
::
--
MAX Robin Fraser Concentrate Truck and Crusher
--
::
--
MAX Robin Fraser Loading Concentrate Truck
--
::
--
MAX Flotation cells in action
--
::
--
MAX Geology on 900L
--
::
--
MAX QTz Vein Closeup on 900L
--
::
--
MAX Longhole Drilling Blasthole Rings
--
::
--
MAX Intense Stockwork and Qtz Veins in roof 900L
--
::
--
MAX High Grade QTz Veins on 900L
--
::
--
MAX Geology closeup on 900L
--
::
--
MAX Flat-lying QTz Vein closeup on 900L
--
::
--
MAX Disseminated High Grade adjacent to QTz Vein
--
::
--
MAX Blastholes ready for loading
--
::
--
MAX Blasthole Rings and adjacent open stope
--
::
--
MAX Molybdenite pregnant flotation cell
--
::
--
MAX Adit2 panorama JAN08
--
::
--
MAX Fine Ore Bin JAN08
--
::
--
MAX Fine Ore Feeder JAN08
--
::
--
MAX Mill Operators 2 JAN08
--
::
--
MAX Mill Operators JAN08
--
::
--
MAX MoS2 BAG118 JAN08
Page: 1 |


Page: 1 | 2 | 3 | 4 | <Next>
MAX Photos 2007
--
::
--
First Moly Concentrate Shipment from MAX Mine
--
::
--
First Moly Concentrate Shipment from MAX Mine
--
::
--
First Moly Concentrate Shipment from MAX Mine
--
::
--
First Moly Concentrate Shipment from MAX Mine
--
::
--
MAX Flotation at work
--
::
--
MAX Flotation cell
--
::
--
Roca's O'Grady, Skerlec, Broughton and Mirko receive CMEBC Award
--
::
--
MAX Robin Fraser and Kevin Ehman bagging MoS2 Concntrate
--
::
--
MAX Robin Fraser bagged MoS2 Concntrate
--
::
--
MAX Bagged MoS2 Concentrate
--
::
--
MAX Filtering and Bagging Mos2 Concentrate
--
::
--
MAX Filtering MoS2 Concentrate
--
::
--
MAX Filtering MoS2 Concentrate A
--
::
--
MAX Mill Sampling
--
::
--
MAX Flotation Cell
--
::
--
MAX Flotation Cell 2
--
::
--
MAX Flotation Cells
--
::
--
MAX Aerial Site
--
::
--
MAX Aerial Site 2
--
::
--
MAX Aerial Site 3
--
::
--
MAX MoS2 flotation concentrate
--
::
--
MAX Robert Jomphe and regrind mill
--
::
--
MAX Mill in operation
--
::
--
MAX Ball Mills
--
::
--
MAX Fine ore feed to Mill
--
::
--
First cons October 29, 2007
--
::
--
First cons October 29, 2007
--
::
--
First cons October 29, 2007
--
::
--
Concentrate Filter Testing and Commissioning
--
::
--
Flotation Cell Testing and Commissioning
Page: 1 | 2 | 3 | 4 | <Next>


Page: 1 | 2 | 3 | 4 <Prev> <Next>
MAX Photos 2007
--
::
--
Concentrate Thickener Testing and Commissioning
--
::
--
Flotation Area Testing
--
::
--
No. 2 Mill Motor Replacement
--
::
--
No. 1 Mill Commissioned
--
::
--
MAX Long Hole Production Drill
--
::
--
Frank O'Grady and John Mirko
--
::
--
MAX Visitors Trevor Torzsas(l) and John Hughes(r) with Frank O'Grady
--
::
--
Transfer Station Looking East
--
::
--
No. 1 Belt to Transfer Tower
--
::
--
No. 1 Belt to Transfer Tower
--
::
--
Loading Rock From Apron Feeder to Jaw Crusher
--
::
--
Crushed Rock on No. 1 Belt
--
::
--
Coarse ore bin September 2007
--
::
--
Crusher conveyors September 2007
--
::
--
Mill and Crusher August 2007
--
::
--
Mill flotation floor September 2007
--
::
--
Mill September 2007
--
::
--
No3 conveyor from crusher
--
::
--
Tour by U of S Students
--
::
--
Transfer Tower
--
::
--
Ug Miner September 2007
--
::
--
Visitors to the MAX Molybdenum Mine
--
::
--
Miners unloading ore cars
--
::
--
Stope development on 925L
--
::
--
South Dam filter zone construction
--
::
--
South Dam construction
--
::
--
View to South Dam
--
::
--
North Dam construction
--
::
--
North Dam construction
--
::
--
Placing Rockfill on North Dam
Page: 1 | 2 | 3 | 4 <Prev> <Next>


Page: 1 | 2 | 3 | 4 <Prev> <Next>
MAX Photos 2007
--
::
--
Crusher and Hilfiker Wall construction
--
::
--
Conveyors 1 and 2
--
::
--
Fuel storage area
--
::
--
Unloading LH Drill
--
::
--
Stopemaster Longhole Drill Prep
--
::
--
Stopemaster Longhole Drill Prep
--
::
--
MAX Adit #2 Drill Jumbo
--
::
--
MAX Crusher transfer tower assembly
--
::
--
MAX Dam construction materials testing
--
::
--
MAX Dam Construction
--
::
--
MAX unloading Diamond Drill
--
::
--
Frank O'Grady & Scott Broughton @ Max UG Workshop - June 18
--
::
--
MAX Mill Coffee break
--
::
--
MAX Crusher and Mill construction
--
::
--
MAX Crusher Conveyors Assembly
--
::
--
MAX Mill, Crusher and office
--
::
--
MAX Portals and mine office
--
::
--
Max Stockwork June 18 022
--
::
--
MAX Tailings area spillway
--
::
--
MAX Tailings Facility construction
--
::
--
MAX Tailings Facility
--
::
--
MAX Twin Portals
--
::
--
MAX Mine Office
--
::
--
MAX Mill Genset Commissioning
--
::
--
MAX Mill and Powerhouse construction
--
::
--
MAX Flotation equipment completion
--
::
--
MAX Fine Ore Bin
--
::
--
MAX Electrical work on flotation floor
--
::
--
Fine Ore Bin assembly
--
::
--
Fine Ore Bin assembly
Page: 1 | 2 | 3 | 4 <Prev> <Next>


Page: 1 | 2 | 3 | 4 <Prev>
MAX Photos 2007
--
::
--
Thickener Floor
--
::
--
Mill construction
--
::
--
Flotation cells installed
--
::
--
Flotation cell assembly 2
--
::
--
Flotation cell assembly 1
--
::
--
Flotation agitators
--
::
--
Fine ore bin assembly
--
::
--
Cone crusher
--
::
--
Mine Rescue Equpment Training Graham Seal-Jones MAY07
--
::
--
Crusher Bin and feeder support MAY07
--
::
--
Mill steel work MAY07
--
::
--
Millwrights aligning No2 mill bearings MAY07
--
::
--
Worker Preparing MAX Mill for Roof Cladding
--
::
--
Mill steel work APR07
--
::
--
Mill concentrate loadout
--
::
--
Crusher development APR07
--
::
--
High Grade Stockpile Apr 07
--
::
--
Mill Building Apr 07
--
::
--
Mill Building Apr 07
--
::
--
Rock Dump Apr 07
--
::
--
UG Surveying Apr 07
--
::
--
MAX Plant Site and Tailings area
--
::
--
MAX Plant Site
--
::
--
MAX Crusher steel assembly
--
::
--
Rock Dump
--
::
--
Crusher
--
::
--
John Mirko and Doug Fosbrooke at MAX cone crusher
--
::
--
MAX ball mill construction
--
::
--
MAX mill construction John Mirko and Mike VVI
--
::
--
Gensets Placed
--
::
--
Flotation Floor
--
::
--
Ball Mill Placed
--
::
--
Cone Mantle Placed
--
::
--
Jaw Crusher Lift
--
::
--
Jaw Crusher Placed
--
::
--
Mill Mar 4, 2007
--
::
--
Max Mill Building
--
::
--
Max Mill Flotation Section
--
::
--
Max Mill Steel
--
::
--
Max Mill Steel Riggers
--
::
--
MAX Underground Decline Development Muck 19FEB07
--
::
--
MAX Mill Steel Work 19FEB07
--
::
--
MAX Mill Steel Work 19FEB07
--
::
--
MAX Mill Steel Work 19FEB07
--
::
--
MAX underground lunchroom 19FEB07
--
::
--
MAX Mill Roof Trusses 18FEB07
--
::
--
MAX Mill Roof Trusses 18FEB07
--
::
--
MAX Crusher building concrete 16FEB07
--
::
--
MAX Mill flotation floor assembly 16FEB07
--
::
--
MAX Mill Steel 17FEB07
--
::
--
MAX Crusher building concrete 16FEB07
--
::
--
Ball Mill Bearing
--
::
--
MAX Mill Steel Erection 13FEB07
--
::
--
MAX Ball mill unloading FEB07
--
::
--
MAX Ball mill installation Feb 07
--
::
--
MAX Steel Crews Sorting Roof Trusses
--
::
--
MAX Steel Column Base Grinding
--
::
--
MAX Mill Steel Work
--
::
--
MAX Mill Steel Erection
--
::
--
MAX Thickener Steel
--
::
--
MAX Camp
--
::
--
MAX Engineers Heading Underground
--
::
--
MAX Final crusher concrete work
--
::
--
MAX Jumbo drilling safety bay
--
::
--
MAX Lefthand Mill drive bearings
--
::
--
MAX Loading 10 ton cars Ug
--
::
--
MAX office and Ug genset
--
::
--
MAX Portal area
--
::
--
MAX Snow removal and road maintenance
--
::
--
MAX Temporary mine dump area
--
::
--
MAX Thickener Tank Assembly
--
::
--
MAX Underground survey review
--
::
--
MAX view from Portal
--
::
--
Old Trout Lake House 1950s
--
::
--
Windsor Hotel 1890s
--
::
--
Windsor Hotel 2005
--
::
--
Windsor hotel with coach 1890s
--
::
--
Windsor Hotel at Trout Lake 1950s
--
::
--
Windsor Hotel Trout Lake 1950s
Page: 1 | 2 | 3 | 4 <Prev>


MAX Photos 2006
--
::
--
New exposure of high-grade molybdenum underground at MAX - Nov06
--
::
--
GENEX Miner at Rock Dump
--
::
--
Snow clearing at Plantsite
--
::
--
Underground Development Rock Dump
--
::
--
Plant Site Area
--
::
--
Tailings Facility Construction
--
::
--
Mine Office And Dry
--
::
--
Ball Mill Loaded For Transport
--
::
--
Dam filter sand screening plant Galena Bay Construction
--
::
--
Drilling Ug truck shop slash GENEX Mining
--
::
--
Drilling with Electric Jumbo GENEX Mining
--
::
--
Drilling with Electric Jumbo GENEX Mining
--
::
--
Foundation cleaning for main dam Galena Bay Construction
--
::
--
Main Dam foundation preparation Galena Bay Construction
--
::
--
Stockpiling filter sand for dams Galena Bay Construction
--
::
--
Mill concrete walls and footings OCT 06
--
::
--
Undergound shop office and dry building OCT 06
--
::
--
Tailings Area Excavators preparing foundation
--
::
--
Tailings area organic soil excavation stockpiling OCT 06
--
::
--
Tailings dam filter sand delivered and stockpiled OCT 06
--
::
--
Mill Bin Wall Sections On Lowboy
--
::
--
Mill Base Ready For Mill Assembly
--
::
--
Mill Building Upper Perimiter Wall
--
::
--
MAX Portal - Drill Jumbo and Loci
--
::
--
MAX Camp - Mill Site - Tailings Facility
--
::
--
MAX Mill Site - Crusher Site - Mine track - Portal
--
::
--
MAX Mill Site Construction
--
::
--
Aerial View (September)
--
::
--
Exploration Board Davidson Carter Jonson Macauley
--
::
--
Exploration Board examining core
--
::
--
Davidson examining core
--
::
--
Exploration Board Davidson Macauley Carter
--
::
--
Exploration Board Macauley Jonson Davidson
--
::
--
Geotech drilling in Tailings area
--
::
--
Undergound drill jumbo ready to go
--
::
--
Undergound drill jumbo ready to go
--
::
--
VanIsle Concrete crew
--
::
--
Closeup of pumping concrete to fine ore bin
--
::
--
Concrete Pumping to fine ore bin
--
::
--
Concrete pumping to fine ore bin
--
::
--
Fine ore bin concrete placement
--
::
--
Fine Ore Bin Formwork
--
::
--
VanIsle Concrete Formwork
--
::
--
Left Mill Base Formwork
--
::
--
Plant site area prep
--
::
--
Underground equipment outside of portal
--
::
--
Scott Broughton and Bill Bennett at Plantsite
--
::
--
Bill Bennett and Roca Team at MAX portal
--
::
--
Ricci Berdusco Scott Broughton Bill Bennett at MAX portal
--
::
--
Blasted Crusher Conveyor Gallery
--
::
--
Blasting Crusher Conveyor Gallery
--
::
--
Drilling and Blasting Mill site
--
::
--
Workers extracting waste rock from MAX mine
--
::
--
View of MAX Mine Access Adit From Above
--
::
--
Mill Building Jun06
--
::
--
Crusher Building Dismantling Jun06
--
::
--
Crusher Building Jun06
--
::
--
Flotation Cell Clean Up Jun06
--
::
--
View from Mill to Transfer Building Jun06
--
::
--
Mill Building Jun06
--
::
--
Motors And Equipment Prep Jun06
--
::
--
Van Stone Crusher June 20 2006
--
::
--
Transfer Building Cladding removal & crane early Jun06
--
::
--
Transfer Building Cladding removal early jun06
--
::
--
Transfer Building Cladding removal early Jun 06
--
::
--
Transfer Builindg exposed early Jun06
--
::
--
Action pic of cladding removal early Jun06
--
::
--
Crusher Building Cladding early Jun06
--
::
--
Fine Ore Bin exposed early Jun06
--
::
--
Mill and Flotation area exposed early Jun06
--
::
--
Mill Building Cladding removal Early Jun06
--
::
--
Crusher Building
--
::
--
Doug Seaton - Water quality sampling
--
::
--
Hwy 31 to Trout Lake
--
::
--
Early morning Trout Lake
--
::
--
John Kiernan, P.Eng.
--
::
--
MAX Crusher foundation area
--
::
--
MAX Mill Bedrock foundation
--
::
--
MAX Mill foundation area
--
::
--
MAX Mill foundation area
--
::
--
Mike Middleton Plant site survey
--
::
--
MAX Plantsite area
--
::
--
MAX Portal area
 


MAX Photos 2005
2005 U/g Infill Drilling Program

Dave Grieve & Tom Schroeter Underground at MAX

High grade Core June 2005

Tom Schroeter Senior Regional Geo BCMEM Surveys Site

BMills Genex Mining May 2005

Core saw tent May 2005

Dave Skerlec, CFO May 2005

DTaylor and core May 2005

Genex Mining May 2005

High Grade Core May 2005

High Grade in Ug wall May 2005

High Grade in Ug wall May 2005

High Grade in Ug wall May 2005

Hytech Drill May 2005

Hytech Drill May 2005

Hytech drill Ug May 2005

JMirko & DTaylor May 2005

MAX Analyst Tour Doug Leishman and DTaylor May 2005

MAX Analyst Tour May 2005

MAX Analyst Tour Ug May 2005

MAX Analyst Tour with Morgan, Leishman, Mustard and Kaiser May 2005

Mirko and Mehling Ug May 2005

PMehling at MAX May 2005

PMehling baseline sampling May 2005

PMehling baseline sampling May 2005

PMehling baseline sampling MAX May 2005

Sbroughton Ug May 2005
 

Supplies arriving

Max Site April 2005

MAX Portal re-opened

MAX Portal April 2005

Powering up May 2005

Molybdenite in Adit

Adit View May 2005

Trout lake gas and general store

Mobilizing Drill May 2005

Hy-Tech drill mobilization May 2005

MAX site May 2005